Move the estate. Keep the business running.
Relocations concentrate a great deal of risk into a very short window. Trivora plans the technical side of the move in detail — what is decommissioned, how it travels, what is installed where, and what must be live before staff arrive.
Work is scheduled out of hours and over weekends where required, with pre-move surveys, labelling discipline and a tested cutover sequence so Monday morning is uneventful.
Office moves, equipment relocation and data centre migration planned around your operating hours.
Site surveys at both ends, equipment audit, floor plans and connectivity readiness checks.
Controlled decommissioning, labelling, packing and secure transport of IT equipment.
Reinstallation, cabling, testing and user setup at the destination site.
Rack-level migration planning, sequenced moves, rack and stack, and post-move validation.
Business-as-usual restored on the first working day
No lost or unaccounted-for equipment
Documented, labelled installation at the new site
Reduced risk during the cutover window
Tell us about your requirement and we will come back with a proposed approach for IT Relocation.